The diagrams below show the stages and equipment used in the cement-making process, and how cement is used to produce concrete for building purposes.

Same questionCompare 3 different answers (Band 4.5–6)
Same-task comparison

This response is estimated at Band 4.5. Can you write a better one?

Write yours and get clear feedback on all four criteria.

  • Closest to official scores
  • What to fix on each criterion
  • Feedback in about 20 seconds · free
Start writing this task

Sample Response

1

The maps illustrate the differences in the layout of Grange Parka grange park over the past 106 years.

2

A century ago, there were two entrances located on Arnold Avenue and Eldon Street,the Arnold avenue and the Eldon street , respectively. In the center of the park stood a fountain,The center of the park was a fountain, with a stage for musicians on its west side. On the west side, surrounding the stage, the northern and southern sections were symmetrical, each containing a rose garden and two seating areas. On the east side, a rose garden lay in the northeast corner, between the northern entrance and a water feature or plant ponda pond for water plants. Similarly, a glasshouse was nearnearby the southern entrance, while another seating area was located in the east of the parkanother seating area located in the east of the park.

3

RegardingRegarding to the present map, the two entrances and the rose garden in the northwest corner have remained unchanged. The fountain in the center has been replaced by a rose garden, which is surroundedsurrounding by four seating zones. The original stage and four seating areas as well as the one on the south side of the parkas well as the other on the south side of park, have been removed to make way forgive way to an amphitheatre for concerts. In the northeast corner, the rose garden has been converted intoto a cafe, while the pond has been replaced by a children’s play area. Moreover, the glasshouse has disappearedglasshouse disappeared and a water feature has been newly built on its sitelocation, which a new entrance of underground car park to its righton the right hand of it.

4

Overall, there have been considerable changesthere are considerable changes during these years. While the two entrancesWhile two entrances and the northwestern rose garden have remained unchanged, the rest of the park has been completely redeveloped, with almost all its functions transformed.

Overall assessment

Why this response received Band 4.5

文章最大的问题在于完全偏离了给定的图表题目,误将水泥与混凝土制作流程图写成了公园布局对比地图,导致任务完成度极低。在语言层面,虽然具备一定的词汇量和段落组织意识,但语法结构与介词搭配仍存在较多错误。首要提升任务是仔细审题与核查图表信息,确保写作内容与题目给出的图表完全一致。

Band score breakdown

IELTS Writing Criteria Scores

TA

任务完成度

2.0
Scoring rule

文章完全脱离了给定的水泥和混凝土制作流程图,描述了无关的公园地图变更,未能履行 Task 1 的基本任务要求。

Next step

在动笔前务必仔细核对题目说明与给出的图表,确保全面准确地描述所给流程图的关键步骤与数据。

CC

连贯与衔接

5.0
Scoring rule

文章采用了基本的段落划分并使用了部分连接词,但由于描述对象与题目不符,内容逻辑与图表无法对应。

Next step

按照流程图的时间顺序或步骤逻辑来组织段落,使用表示先后顺序的衔接词来增强逻辑连贯性。

LR

词汇资源

6.0
Scoring rule

文章使用了如 redeveloped、amphitheatre 等与地图相关的词汇,但存在 Regarding to 和 nearby 等词汇搭配错误。

Next step

积累并准确运用描述生产流程的专门词汇(如 raw materials、rotated、grind、mix 等)及固定介词搭配。

GRA

语法多样性与准确性

5.0
Scoring rule

文章尝试使用了多种句式,但出现了 is surrounding by、缺少谓语动词以及从句结构不完整等较多语法错误。

Next step

加强对被动语态和定语从句等复杂句型的准确性练习,避免出现句子成分缺失或语态错误。