The process shows the design of a modern landfill for household waste.
This response is estimated at Band 8.0. Can you write a better one?
Write yours and get clear feedback on all four criteria.
- Closest to official scores
- What to fix on each criterion
- Feedback in about 20 seconds · free
Sample Response
The diagram shows how a modern landfill for household waste is built, used, and closedbuilt, used and closed.
Overall, there are three main stages in this process, startingthis process starting from constructing a lined pit in natural rock, and culminating in covering the waste with clay.
In the first stage, a man-made hole is dugworkers dig a hole in natural rock. Clay and a synthetic lining are put inside the hole to make a barrier. Subsequently, drainage pipes, which connect to a drainage tank, are laid at the bottom of this pit .
Next, the landfill is ready for use. Trucks deliver household waste and dump it into the lined cavity. As waste piles up, liquid passes through the waste and flows into the drainage pipes, before being collected in the tank.
In the final stage, the landfill is closed. A clay layer is placed on top of the waste. An L-shaped pipeA vertical pipe goes through the waste and the clay cover so that gases can escape. Meanwhile, the underground drainage system and tankoriginal drainage system under the waste remains operationalstill works.
Why this response received Band 8.0
The essay presents an exceptionally clear description of the landfill process, featuring a accurate overview and logical stage-by-stage organization. The vocabulary is natural and precise, while complex grammatical structures are used fluently throughout. To refine the response further, ensure that specific details, such as the output pipe for gas emissions, are explicitly integrated into the final stage.
IELTS Writing Criteria Scores
Task Achievement
All key stages of construction, usage, and closure are accurately identified and clearly outlined in the overview.
Explicitly mention that the gas pipe redirects gas output above ground to fully capture the details of the closure visual.
Coherence and Cohesion
The response is organized logically into stage-based paragraphs with smooth transitional markers.
Maintain this strong structural flow while ensuring sequential markers vary naturally between sentences.
Lexical Resource
A wide range of topic-specific vocabulary and precise phrasing is used appropriately.
Incorporate additional precise technical terms, such as leachate or impermeable layer, to enhance lexical sophistication.
Grammatical Range and Accuracy
Grammatical structures show high control with a natural mix of active, passive, and complex sentences.
Continue using complex clauses effortlessly while reviewing minor punctuation placement around prepositional phrases.