The process shows the design of a modern landfill for household waste.
This response is estimated at Band 9.0. Can you write a better one?
Write yours and get clear feedback on all four criteria.
- Closest to official scores
- What to fix on each criterion
- Feedback in about 20 seconds · free
Sample Response
The diagram outlines the three sequential stages required to build, operate, and sealbuild, operate and seal a modern landfill designed for household waste.
Overall, the facility is formed by excavating a hollow within natural rock and fitting protective linings, before waste is deposited and liquid runoff is collected. Once full, the landfill is capped with clay, and a separate vent pipe is added to release gases, while the original liquid drainage infrastructure continues to function.
In the initial construction stage, a large man-made holeman-made cavity is cut into natural rock. Clay is laid to line this hole, and a synthetic lining is placed on top of the clay layer. Drainage pipes are positioned along the base of this lined hollow, connected to a drainage tank designed to collect waste liquidtank that gathers liquid.
When the landfill is in use, lorries unload household waste into the cavity. As waste builds up, liquid percolates through the refuse and travels along the drainage pipes into the tank below.
In the final closure stage, the accumulated waste is covered by a clay cap. A bent pipe extending horizontally to one sidevertical pipe runs through both the waste mass and the clay cover, allowing gases to escapeescape outwards. Importantly, the drainage pipes and collection tank installed earlier remain intact beneath the waste.
Why this response received Band 9.0
The response provides an exceptionally clear and fully comprehensive description of the landfill design process, covering all key stages with complete accuracy. Logical paragraphing and sophisticated cohesive devices ensure seamless progression across the response. To maintain this high standard, the writer should continue using precise technical language while maintaining complete accuracy with diagram features.
IELTS Writing Criteria Scores
Task Achievement
All stages of the landfill construction, operational phase, and final closure are clearly highlighted and described accurately with a well-developed overview.
Ensure all minor features remain thoroughly integrated without adding any external assumptions.
Coherence and Cohesion
Information and ideas are logically sequenced throughout, supported by natural and effective paragraphing and transitions.
Maintain the current seamless flow by continuing to vary structural cohesive devices across body paragraphs.
Lexical Resource
A wide range of vocabulary is used flexibly and precisely to describe technical process steps and materials.
Continue using precise process verbs and domain-specific terms to sustain full flexibility.
Grammatical Range and Accuracy
Grammatical structures are varied, accurate, and used with complete control throughout the entire description.
Sustain precision in complex sentence combinations when detailing multi-step physical processes.