Sample Response

1

The diagram illustrates the process of electricity production in a hydroelectric power station. It begins with the river entering the high-level reservoir and culminates in electricity being suppliedculminates in electricity distributed to the national grid.

2

Initially, the river enters the high-level reservoir, where a dam holds back the waterwhich using a dam slows down the water flowing process. During the day, the water intakeDuring the day water intake is open and the water flowsflowes down a sloping pipe towards the reversible turbines, which operate the generatoroperate generator during the day. Subsequently, the water leaves the turbines and flows towards the low-level reservoir.

3

By contrast, at night,On the other hand, at night water stored in the low-level reservoir flows back towards the reversible turbines, which pump water into the high-level reservoir. The water moves upward through the sloping pipe during pumping. The intake is closedThe gap between the dam and the ground is closed during the night time.

4

In addition, the generator, which is operated using the reversible turbines, is located in the power station. Electrical current moves through power lines and is transmitted to the national grid.

Overall assessment

Why this response received Band 6.5

The response effectively outlines the main stages of electricity generation and contrasts daytime and nighttime operations logically. However, minor visual misinterpretations and mechanical grammatical errors slightly diminish overall clarity. Precision in reading technical diagram labels and practicing complex sentence control will produce a higher-level report.

Band score breakdown

IELTS Writing Criteria Scores

TA

Task Achievement

7.0
Scoring rule

The main stages and contrasts between day and night operations are covered with a clear overview, though the intake mechanism is slightly misinterpreted.

Next step

Ensure all technical visual elements, such as the open and closed intake valve, are reported accurately without misreading structural lines.

CC

Coherence and Cohesion

7.0
Scoring rule

Information is logically organized into distinct paragraphs comparing daytime generation and nighttime pumping.

Next step

Vary cohesive transitions to avoid relies on basic sentence starters when connecting related steps in a continuous process.

LR

Lexical Resource

6.0
Scoring rule

A good range of topic-specific vocabulary is used correctly, though occasional spelling mistakes and awkward phrasing appear.

Next step

Proofread spelling carefully for basic verb forms and refine word choices to describe mechanical functions naturally.

GRA

Grammatical Range and Accuracy

6.0
Scoring rule

A mix of simple and complex sentence structures is attempted, though minor grammatical errors and missing articles recur.

Next step

Focus on correct article usage and refine relative clause structures to improve grammatical precision throughout complex descriptions.