The diagrams below show a comparison between two road tunnels in two Australian cities.
趁题目在眼前,限时写一篇
按考试时间写完,就知道自己在四项评分标准上各差在哪。
- 题目和图表已放好
- 按考试计时 20 分钟
- 约 20 秒出反馈 · 免费
2篇作文批改
分数
- 9.0分查看完整批改 →
- 任务完成
- 9.0分
- 连贯与衔接
- 9.0分
- 词汇资源
- 9.0分
- 语法范围与准确性
- 9.0分
The diagrams illustrate two road tunnels constructed in different Australian cities, showing their respective construction timelines, financial outlays, physical dimensions, geology, cross-sectional configurations and surface environments. Overall, Tunnel B is substantially longer, deeper and considerably more expensive than Tunnel A.
- 8.0分查看完整批改 →
- 任务完成
- 8.0分
- 连贯与衔接
- 8.0分
- 词汇资源
- 8.0分
- 语法范围与准确性
- 8.0分
The diagrams illustrate two road tunnels located in separate Australian cities, by comparing their construction periods, expenditure, size, ground composition, cross-section design and surroundings. Overall, Tunnel B is longer, deeper and far more costly than Tunnel A.
相关题目
趁题目在眼前,限时写一篇
按考试时间写完,就知道自己在四项评分标准上各差在哪。
- 题目和图表已放好
- 按考试计时 20 分钟
- 约 20 秒出反馈 · 免费
趁题目在眼前,限时写一篇
按考试时间写完,就知道自己在四项评分标准上各差在哪。
- 题目和图表已放好
- 按考试计时 20 分钟
- 约 20 秒出反馈 · 免费
The diagrams below show the stages and equipment used in the cement-making process, and how cement is used to produce concrete for building purposes.
趁题目在眼前,限时写一篇
按考试时间写完,就知道自己在四项评分标准上各差在哪。
- 题目和图表已放好
- 按考试计时 20 分钟
- 约 20 秒出反馈 · 免费
The diagram below shows the process by which bricks are manufactured for the building industry.
趁题目在眼前,限时写一篇
按考试时间写完,就知道自己在四项评分标准上各差在哪。
- 题目和图表已放好
- 按考试计时 20 分钟
- 约 20 秒出反馈 · 免费
The diagrams below show the layout of the town's shopping centre at present and after a future redevelopment.
趁题目在眼前,限时写一篇
按考试时间写完,就知道自己在四项评分标准上各差在哪。
- 题目和图表已放好
- 按考试计时 20 分钟
- 约 20 秒出反馈 · 免费