The plans below show the site of an airport now and how it will look after redevelopment next year.

Same questionCompare 7 different answers (Band 6.5–8)
Same-task comparison

This response is estimated at Band 6.5. Can you write a better one?

Write yours and get clear feedback on all four criteria.

  • Closest to official scores
  • What to fix on each criterion
  • Feedback in about 20 seconds · free
Start writing this task

Sample Response

1

The plans illustrate an airport site and the developments that are planned to be carried out in the future. Overall, the site will undergo some noticeable changes, namely the expansion of the area, addition of a transportation system and various essential amenities.

2

At present, the space is divided intoin two separateseperate areas for departures and arrivals, with a single entrance and exit doora single entance and exit doors for each space. In the departures zone, on the west side, a small area is dedicated to check-in. On the opposite side, near a security passport controlcontrole area is a cafe. On the north side of the airport are a total of 8 gatesoverall 8 gates with a walkway, from the first gate to the fourth one. On the east side, the airport hasOn the east side, airport has passport control customscustomes service.

3

After a major redesign, the airport will be significantly expanded, double entrance and exits will be added to the area. On the west side, the check-in zonecheck-in zone will be relocated on the opposite side and the bag drop will be added to the space. The cafe will be on the southwestwest corner, near the entrance doors. Between the passport control area and the gates various shops will be locatedconfined. The number of gates will be increased from 8 to 18 and a sky train service will transport passengersthe sky train service will assist the passengers to get to their designated gate. On the side of arrivals, small cafe and an ATMAtm will be added, along with a car hire service on the southeasteast corner of thean airport.

Overall assessment

Why this response received Band 6.5

The response effectively covers the key features and changes shown in the airport plans, offering a clear overview and logical comparison between current and future layouts. Language control is the main area for improvement, as frequent minor spelling mistakes and missing articles lower the overall precision. Focus on proofreading for basic grammatical errors and spelling accuracy to raise the quality of the report.

Band score breakdown

IELTS Writing Criteria Scores

TA

Task Achievement

7.0
Scoring rule

The main features and changes between the two plans are well highlighted with a clear overview present.

Next step

Ensure all details are reported with precise accuracy, such as describing shop placements as an added concourse feature rather than using restrictive phrasing.

CC

Coherence and Cohesion

7.0
Scoring rule

The overview and paragraph structure logically split the description into current conditions and future developments.

Next step

Use more varied transition signals when introducing changes between the paragraphs to enhance structural flow.

LR

Lexical Resource

6.0
Scoring rule

Vocabulary is generally effective for describing map alterations, though some word choices are awkward and spelling errors recur.

Next step

Review common Task 1 spelling patterns to avoid minor errors like 'seperate', 'entance', and 'controle'.

GRA

Grammatical Range and Accuracy

6.0
Scoring rule

A mix of sentence forms is attempted, but comma splices and missing articles are noticeable throughout the text.

Next step

Practice combining clauses using correct punctuation and coordinating conjunctions to eliminate run-on sentences.